Cases

OVER ITS 20 YEARS, REGEA HAS DEVELOPED MORE THAN 1,000 PROJECTS IN 18 STATES, BEING PRESENT IN ALL FIVE BRAZILIAN REGIONS. IN 2015, THE COMPANY BEGAN ITS INTERNATIONAL OPERATIONS WITH PROJECTS IN ARGENTINA AND NIGERIA.

Environmental diagnosis of wastewater collection systems.

Watershed Plan and levy study on water usage.

Investigations into environmental liabilities in Suzano and Tamanduateí stations.

Geo-environmental charting of areas protected by Law.

Confirmatory investigations of liabilities in the Jacu-Pêssego interconnection.

Revision of the Municipal Plan for Risk Mitigation in Nova Friburgo.

Municipal Plan for Risk Mitigation in the district of Serra.
Investigation of environmental liabilities in three industrial sites.
Inventory of vulnerability and natural disasters in 116 Districts.
Geological-geotechnical report and delimitation of Permanent Preservation Areas for land-use.
Simplified environmental studies for land allotment.
Environmental studies of physical composition for the licencing of diverse projects.
Investigation, monitoring and environmental intervention plan in the area of Fernão Dias highway.
Analysis of Potentially Contaminated Areas – High Speed Trains (TGV).
Studies into the geotechnical stability of mine pits and for the mineral mine licencing of the company’s sites.
Management of contaminated areas of the Thermal Power Station of Igarapé, Jauatuba – MG.
Conservation Plan for the usage of the environment around artificial reservoirs – Pacuera de Jupiá and Ilha Solteira.
Registration of users for levy on water usage.
Preliminary assessment investigation of contamination in the Franca site.
Investigations into environmental liabilities of Bandeirantes, São Francisco and Sapopemba Landfills.
Projects of slope maintenance in 15 areas under risk of landslides.
Preliminary analysis of contaminated areas of the subway lines Orange and Gold and the Green line extension.
Land-use, socioeconomic and water resources mapping and analysis.
Investigation, assessment of toxicological risks and monitoring of environmental liabilities in the industrial plant.
Studies for the mineral and environmental licencing in the municipality of Oriximiná, PA.
Environmental Monitoring Program of erosive processes – Hydropower Stations of Jurumirim, Salto Grande, Rosana e Xavante.
Investigations into environmental liabilities, assessment of toxicological risks and monitoring of the company sites.
Management program for contaminated areas in the port of São Sebastião; and Environmental feasibility studies for Comperj.
Assessment of safety and tightness of tailings dams and water quality.
Investigations into environmental liabilities, intervention plan and waste management of the subway station Tamanduateí.
Executive Project of remediation and closing of Solid Waste Landfills.
Impact assessment of Household Wastewater Disposal on Underground Water Quality in the region of Paranapiacaba (Billings).
Analysis of environmental liabilities in the design of São Lourenço Production Site.
Preliminary Environmental Report for the setting up of protective maintenance of the Billings Reservoir.
Executive Project of remediation and closing of Solid Waste Landfills.
Management of contaminated areas for the construction of Santo André campus.
Investigations into environmental liabilities of the station Oratória of the monorail line Silver 15 of the subway and the AsphaltPlant of Jade line 13 of CPTM.
Investigations, remediation and monitoring of environmental liabilities and assessment of toxicological risks.
Environmental and technical management of works for the improvement of oil drainage, at the substation of Araraquara.
Geotechnical evaluation, instrumentation and monitoring of slopes in the runaway thresholds 17 and 35 of Congonhas airport, São Paulo.
Environmental Development and Protection Plan for Protected and Water Source Recovery Areas (Juquery/Cantareira).
Specialized services for delivering satellite imaging, floral and phyto-sociological inventory and characterization of vegetation in the environment of the Hydropower Station of Sobradinho.
Natural disasters management: Charting of land sliding risks in the slopes of 39 municipalities of the State of Rio de Janeiro and Geotechnical Charting of Urban CapabilitY in 10 municipalities.
Technical aid and support in emergency services concerning geological-geotechnical risk situations and environmental problems in the State of São Paulo.
Investigations, Intervention Measures and Management Plan for contaminated areas for the urban mobility of São Bernardo do Campo.
Investigations into environmental liabilities, intervention plans and remedial projects in the Pirelli and Santa Bárbara Landfills.


brunogobbi design web sites azulzao